Food distribution center
This center is to fulfill Erbil requirements to access agricultural and garden products from a centralized and integrated place to store, purchase and process them.
Construction & development is planned in 4 phases in an area of 825000 m2.
The project location is 9 Km away the city center of Erbil, close to the existing agricultural product distribution center.
Phase 1
Phase 1 execution and tabulation was started in year 2010 which includes:
- 5 exposition hall with each area of 4000 m2 (50m*160m) & 20000 m2 totally
- 40 private cold storage with volume of 392 m3 (14*7*4)(L*W*H)
- 1 private cold storage with capacity of 5,000 ton
- 18600 m2 of road construction with 355000 m3 of substructure
Phase 2
Phase 2 of food distribution center will be constructed in an area of 55000 m2, east of phase 1.
Phase 2 execution operation is predicted to be completed in 3 years.
Total area of buildings and structures of phase 2 is estimated to be around 143500 m2.
Project Elements
4 huge building
- cold storage :The cold storage is a two-stories building and a roof with versatile application as wide as 45300 m2
- Wholesale : the wholesale is designed as a two-stories building with a versatile roof as wide as 45750 m2
- Super market : the Super Market is designed as a four-stories building with a versatile roof as wide as 43120 m2
- business tower : Business Tower building starts from the third floor of Super Market and is 18 stories high with total area of 38000 m2:
Phase 3
Phase 3 of food distribution center will be constructed in an area of 215000 m2, east of phase 2 this Phase execution operation is predicted to be completed in 3 years.
Total area of halls and structures of phase 3 is estimated to be around 115500 m2 which includes:
Phase 4
Phase 4 of food distribution center will be constructed in an area of 189000 m2, south of phase 1 this Phase execution operation is predicted to be completed in 1 year.
Phase 4 is “Sample Energy & Agriculture Promotion Farm” and this phasewhich includes:
Educational Sectors Include:
- Conference Hall (150 people)
- 10 Classrooms
- 2 Research Laboratories
Workshop Sectors Include:
- Biogas Production Workshop
- Purification of Urban Wastewater Workshop
- Compost Production Workshop
- Vermicomposting Production Workshop
- Wind Electricity Production Workshop
Farms & Plantation Halls:
- Hydroponic Greenhouse
- Flower Plantation Farm
- Mushroom Plantation Hall
- Pisciculture Pool
- Apiculture Farm
- Trichogramma Keeping Farm
Accommodations include:
- Dining Hall (250 people)
- Dormitory (75 people)
- Sports Complex & SPA
- Hot & Cold Water Pools
Budget
The investment made on this project, based on the estimations, is beyond 180 million dollars.